TY - JOUR AU - Григоровський, П. Є. AU - Крошка, Ю. В. PY - 2019/11/28 TI - METHOD OF RESEARCH OF DURATION OF GEODESIC WORKS IN THE COMPONENT OF TECHNOLOGICAL PROCESS OF ERECTION OF MONOLITHIC>FRAME BUILDINGS JF - Building production; Vol 1 No 66 (2019): Building ProductionDO - 10.36750/2524-2555.66.3-10 KW - N2 - Geodetic works are the basis for the execution of construction and assembly works, and they cannot be separated from the technological process, since: the installation of building structures is per formed only after the marking works (removal to the nature of axes and marking of risks); installation of structures or formwork is accompanied by measurements, adjustment and adjustment of their posi tion; the beginning of the next stage of construction requires a geodetic inspection of structures assem bled in the previous stage. It is impossible to put into operation a construction object without the execu tive documentation, which is made on the basis of executive surveying surveys. That is, geodetic works lie on the critical path of operations of any technological process. The method is developed and an exam ple of the study of labor costs in the performance of geodetic works in the technological process of erec tion of monolithic frame buildings, which can be applied to create an information and mathematical model of technological process of measurements taking into account the influence of organizational and technological factors. UR - http://ndibv-building.com.ua/index.php/Building/article/view/72